The SVOM satellite left the IAM CAS clean rooms in Shanghai and arrived at the Xichang launch site in Sichuan province on 10 May. It……
The end-of-Phase C Review (Critical Design Review) was held by videoconference from June 29 to July 10, 2020. The SVOM project has been strongly impacted……
Since September, the Chinese SECM and French CNES teams have been working together on the integration and environmental testing of the “qualification model” satellite. This……
Optical follow-up of gravitionnal waves The first results of the space mission SVOM (for Space-based multi-band astronomical Variable Objects Monitor) have just been released before……
The mid-phase C review named System Interface Review (SIR) was held in Xi’an from October 16 to 19, 2017 in Shaanxi Province. The purpose of……
After the one holds in Les Houches in April 2016, the second scientific workshop of SVOM mission took place from 24 to 28 April 2017……
The passing of Neil Gerhels on Monday the 6th of February 2017 is an immense loss for our scientific community. We have lost not only……
The Preliminary Design Review (PDR), one of the key stages in the conduct of a space project, was held from 4 to 6 July 2016……
As part of the preparation of SVOM mission, a scientific workshop from 10 to 15 April 2016 at Ecole de Physique des Houches in the……
A meeting on the advancement of the SVOM project took place from 21 to 25 March 2016 in Shanghai inside the building of SECM (Shanghai……